b. Rotate the switch to fully open the valves as illustrated above.
Attention:
• Pay close attention to the front display of CDU and maintain the system pressure at one bar.
• For more information about liquid temperature and system pressure requirements, see
“Water
requirements” on page 13
.
Step 14. Slowly open the bleeder valve to conduct the air out of the hose. Close the bleeder valve once a
steady stream of water flows into the bucket or there are only minimal bubbles in the bleeder hose.
Figure 192. Opening the bleeder valve on the supply side
Step 15. Install the bleeder kit to the manifold return side.
186
ThinkSystem SR630 V4 User Guide