EasyManua.ls Logo

Lucent Technologies FiberReach DDM-2000 - Page 1192

Lucent Technologies FiberReach DDM-2000
1896 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NTP-018
: Circuit Order 363-206-305
Page 4 of 6 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED. . . . .FOR DETAILS, GO TO
8. Make necessary VT1.5/STS1 cross-connections at each node in
the network:
DLP-518
A. Single-Ring Configuration
DLP-526
B. Single/Dual OC-3 or OC-12/OC-1 FiberReach Configuration
DLP-528
C. Stand-Alone OC-3/OC-1 FiberReach Configuration
DLP-530
D. Single/Dual OC-48 or OC-192/OC-3 or OC-12 FiberReach
Configuration
DLP-535
E. Single/Dual OC-12/OC-3 FiberReach Configuration
F. Dual-Ring Interworking (DRI) Configuration in 363-206-285,
DDM-2000 OC-3 Multiplexer, TARP Release 13 and Later,
User/Service Manual (TOP) - Volume II,
DLP-550
.
9.
NOTE:
For a DS1 circuit in a path protected ring network, the
sw-path-( ):address
command must be used at the
terminating nodes [and dual ring interworking (DRI) nodes in
a DRI ring network] to switch the active VT1.5 (DS1) path to
repeat this test on the other path(s).
Perform DS1 end-to-end transmission test for each circuit being
put into service, as required:
DLP-510
A. FiberReach Configurations
B. Dual-Ring Interworking (DRI) Configuration in 363-206-285,
DDM-2000 OC-3 Multiplexer, TARP Release 13 and Later,
User/Service Manual (TOP) - Volume II
,
DLP-554
.
10. Use the rtrv-state-eqpt: command to determine the port
state of the DS1 port(s) of the circuit being established.

Table of Contents

Related product manuals