Crane operation
11.3 Crane operation with main boom
Operating manual GMK 6400 3 112 993 en 11 - 87
12.07.2013
If symbol (1) is still flashing after approx.
10 seconds, this means that the locking pins
are under load.
• Release the control lever.
To relieve the load, carefully retract and
extend a little.
If removing the load does not cause unlocking, you must lock the telescopic
section (
à p. 11 - 89) and restart unlocking.
s
S
Risk of damage to the boom system
If extending and retracting several times does not lead to the lock being
released, you must not telescope any further against the stop.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals