EasyManua.ls Logo

Manitowoc GROVE GMK 6400

Manitowoc GROVE GMK 6400
960 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.7 Rigging/unrigging the counterweight
Operating manual GMK 6400 3 112 993 en 12 - 81
12.07.2013
12.7.8 Establishing/disconnecting the hydraulic connection
Establishing
Remove the caps from the ports (3).
Remove the hoses (2) from the brackets (1)
and connect them to the ports (3).
Disconnecting You must disconnect the hydraulic connection before lifting the 15-t base
plate from the carrier.
Remove the hoses (2) from the connections
(3).
Close all the hoses and connections with the
caps.
Fit the hoses (2) into the brackets (1).

Table of Contents

Related product manuals