EasyManua.ls Logo

Manitowoc GROVE GMK 6400

Manitowoc GROVE GMK 6400
960 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crane operation
11.7 Heating and air-conditioning system
Operating manual GMK 6400 3 112 993 en 11 - 135
12.07.2013
Preheating the
crane cab
If the crane cab is to be preheated in addition to the engine, adjust the heat-
ing system as follows:
Switch (1) to Warm setting
Switch (3) to the Recirculated air symbol
Turn switch (2) to the required fan level
Open the air vents; à p. 11 - 131
H
The amount of time required to preheat the engine will be increased signif-
icantly by simultaneously heating the crane cab.
s

Table of Contents

Related product manuals