EasyManuals Logo

Manitowoc GROVE GMK 6400 User Manual

Manitowoc GROVE GMK 6400
960 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #820 background imageLoading...
Page #820 background image
Rigging work
12.8 Rigging the auxiliary hoist
12 - 104 3 112 993 en Operating manual GMK 6400
12.07.2013
Releasing the
locking pin
• Open the safety valve; à p. 12 - 102.
• Press the button (1). The lamp lights up.
• Press the key combination (2), until the lamps (3) are lit.
If a locking pin has not yet reached the
Unlocked end position, the corres-
ponding lamp will flash.
• Close the safety valve for the transport; à p. 12 - 102.
Releasing the
locking pin

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals