Installation
135
Mitel 415/430 as of R4.1
syd-0580/1.2 – R4.1 – 08.2016
The patch cables are available separately in lengths of 1 and 2 m (see "Equipment
Overview", page 245).
The internal wiring of the 3 connectors right is shown in the table below. The wiring is
shown for sockets 1 - 4. Sockets 5 - 8 are wired accordingly.
Tab. 64 Wiring of sockets 1–4 in the fan-out panel EFOP
EFOP fan-out-panel Internal wiring EFOP fan-out-panel
Socket Pin Signal Signal Pin Socket
–1
1
–2
–3
1a 4
1b 5
–6
–7
–8
–1
2
–2
–3
2a 4
1-4
13a 2b5
23b –6
32a –7
41a –8
51b –1
3
62b –2
74a –3
84b 3a4
3b 5
–6
–7
–8
–1
4
–2
–3
4a 4
4b 5
–6
–7
–8