EasyManua.ls Logo

NEC Univerge SV8100 - Before Installation; Unpacking the Equipment

NEC Univerge SV8100
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 4.1 UNIVERGE SV8100
3 - 40 Installing the SV8100 Chassis
2.7.1 Unpacking the Equipment
Inspect the equipment for any physical damage. If you are not sure
about the function of a component, review the associated information
within this manual. Contact your authorized NEC Sales
Representative if you have additional questions. Note that the
chassis does not initially contain any blades.
Make sure you have appropriate tools for the job, including: a test
set, a punch down tool, and a digital voltmeter.
Ensure that you have a building plan showing common equipment,
extensions, the Telco demarcation and earth ground location before
you start installation. Be sure to properly plan your installation site
and that you are familiar with the installation safety precautions. If
you have not done that, please do so now.
2.7.2 Before Installation
Before installing the chassis check the following:
Ensure that the MPS7101(Power Supply Unit) is OFF and that
that the power cord is disconnected from the AC outlet.
When installing the blades, do not touch the soldered surfaces
as this may cause damage.

Table of Contents

Other manuals for NEC Univerge SV8100

Related product manuals