Issue 4.1 UNIVERGE SV8100
3 - 50 Installing the SV8100 Chassis
2.7.4.4 Connect the Controlling and Expansion Chassis
. Installment of the PZ-BS10 blade and PZ-BS11 blade(s) must be
completed prior to installation of the provided (CAT 5) expansion
cabling.
1. Ensure Controlling and Expansion chassis are
powered down.
2. Using the NEC provided CAT5 straight-through
cable(s), attach one end to each Expansion Chassis
CN2 connector on the PZ-BS11 blade (see Figure
3-62 System Expansion Cabling on page 3-51.
Attach the opposite end to the CN2, CN3 or CN4
connector on the PZ-BS10 of the Controlling
Chassis.
Figure 3-61 19” Expansion Chassis Interface Units
Expansion Chassis Interface Unit
for the Controlling Chassis
PZ-BS10
Expansion Chassis Interface Unit
for the Expansion Chassis
PZ-BS11