4 - 40 Installing the SV8100 Blades
3.5.2 Installation
To install a PZ-32IPLB/PZ-64IPLB/PZ-128IPLB on the CD-CP00 :
1. With the system power off, remove the CD-CP00.
2. Install the IPLA Daughter board onto the CD-CP00 blade.
3. Insert the CD-CP00 into slot 1 in the Controlling Chassis or.
. Refer to Figure 3-45 19” Controlling Chassis – Guides Slot 1 on page
3-41 for more details.
4. Connect the IPLB Daughter board to the CD-RTB or to an
external switching hub using an ethernet cable.
5. Refer to the Univerge SV8100 Programming Manual for
detailed programming instructions.
3.5.3 Switch Settings
These daughter boards do not have any switches that need to be set
and do not require any hardware setting.
3.5.4 LED Indications
LED indications for the PZ-32IPLB, PZ-64IPLB and PZ-128IPLB
Daughter Boards are indicated in Table 4-17 IPLB Daughter Board
LED Indications. Each LED is listed with its associated function and
LED and Operational status. Refer to Figure 4-4 CD-CP00 Blade
with Daughter Boards Installed on page 4-17 for the location of the
LEDs on the blades.
Table 4-17 IPLB Daughter Board LED Indications
LED Function LED Status Operation Status
Link 10/100
(LED 1)
10Base-T/100Base-TX link
speed indicator
On Red 100Base-TX link up
LINK 1000
(LED2)
1000Base-T link speed
indicator
On Red 1000Base-T link up
DUPLEX
(LED3)
Duplex Status On Yellow Full duplex operation
ACT
(LED4)
Link activity or data
transmission and reception
On Green Link up completed