UNIVERGE SV8100 Issue 4.1
System Hardware Manual 4 - 105
terminal, the blade may not be able to detect the difference between
straight cable and cross-cable automatically. If auto-crossover is not
functioning, use straight cable for that terminal connection.
Table 4-54 CD-RTB Maximum Upgrade Capacities provides the
maximum capacities for the ESIU blades when they are upgraded.
The Router blade can also be used to provide power over category 5
network cables. This eliminates installing separate power adapters
for each IP telephone and it allows for centralized power backup.
6.2.2 Installation
To install the CD-RTB:
1. Plug the CD-RTB blade into any universal slot.
2. Refer to the Univerge SV8100 Programming Manual for
required programming.
6.2.3 LED Indications
LED indications for the CD-RTB are indicated in Table 4-55 CD-RTB
LED Indications. Each LED is listed with its associated function and
LED and Operational status. Refer to Figure 4-36 CD-RTB Blade on
page 4-103 for the location of the LEDs on the blade.
Table 4-54 CD-RTB Maximum Upgrade Capacities
19” Chassis
with CPU
19” Chassis
without CPU
19” Chassis
x4
Networked
Chassis
12850
Table 4-55 CD-RTB LED Indications
LED Function LED Status
Operation
Status
Comments
CN2, CN3
LINK/ACT
LAN
Operation
Status
Green On Link Established Individually for
Ports 1~8
Green
Flashing
Communicating
Data
Individually for
Ports 1~8
Green Off Not Activated Individually for
Ports 1~8
CN2, CN3
10/100
LAN Speed
Status
Orange On 100Mbps Individually for
Ports 1~8
Orange Off 10Mbps Individually for
Ports 1~8