EasyManua.ls Logo

NEC Univerge SV8100 - Floor Mounting the 19 Chassis; CHS2 U Chassis Installation

NEC Univerge SV8100
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 4.1 UNIVERGE SV8100
3 - 12 Installing the SV8100 Chassis
2.2 Floor Mounting the 19” Chassis
The CHS2U controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2U JOINT BRACKET KIT.
2.2.1 CHS2U Chassis Installation
1. Use the template shown in Figure 3-12 Floor Mount Spacing
Guide for required spacing before drilling holes for 0.39”
(10mm) anchor bolts (locally procured).
2. Mark and drill the four holes required for installing the CHS
BASE UNIT.
3. Using anchor bolts, secure the CHS BASE UNIT to the floor.
Refer to Figure 3-13 Secure CHS BASE UNIT with Anchor
Bolts on page 3-13 for screw location.
Figure 3-12 Floor Mount Spacing Guide

Table of Contents

Other manuals for NEC Univerge SV8100

Related product manuals