EasyManua.ls Logo

NEC Univerge SV8100 - Apply Power to the 19 Chassis; Install AC Power Cords on Multiple-Chassis (Optional); Install Additional Blades; Installing the 9.5 Chassis

NEC Univerge SV8100
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 4.1 UNIVERGE SV8100
3 - 54 Installing the SV8100 Chassis
2.7.8 Install AC Power Cords on Multiple-Chassis (Optional)
1. Locate the supplied AC power cords and attach to the AC Inlets
located on the back of the Controlling and Expansion Chassis.
2.7.9 Install Additional Blades
Refer to Chapter 5, 2.1 Installation and Safety Precautions on page
4-3.
2.7.10 Apply Power to the 19” Chassis
Refer to Chapter 5, 2.6 Powering Up the SV8100 on page 4-9.
2.8 Installing the 9.5” Chassis
The 9.5" chassis provides 48 total ports (32 digital terminals) and can include
any combination of stations and trunks below this number.Install 9.5” Chassis
Grounding.
From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG (frame ground) on the back of the
chassis.
1. Ensure the 9.5” chassis (CHS2U GW) is powered off and the AC power
cord is unplugged.
2. Ground the chassis by connecting a 14 AWG wire from the FG lug on the
Figure 3-66 Install 19” AC Power Cords (Multiple-Chassis)
AC Power
Cords to
AC Inlets

Table of Contents

Other manuals for NEC Univerge SV8100

Related product manuals