UNIVERGE SV8100 Issue 4.1
System Hardware Manual 3 - 63
2. Mark and drill the four holes required for installing the CHS
BASE UNIT.
3. Align bolt holes in CHS BASE UNIT (see Figure 3-78 Floor
Mount Spacing Guide on page 3-63) with holes drilled in floor
and secure using four anchor bolts.
4. Align and install the CHS LARGE BATT BOX on top of the CHS
BASE UNIT. Refer to Figure 3-79 Installing the CHS LARGE
BATT BOX using the CHS2U JOINT BRACKET KIT on page
3-64.
Figure 3-78 Floor Mount Spacing Guide