EasyManua.ls Logo

NEC Univerge SV8100 - Page 312

NEC Univerge SV8100
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 4.1 UNIVERGE SV8100
5 - 54 Installing DT300/DT700 Series (DTL/ITL) Digital and IP Multiline Terminals
9. Align the projections on the bottom of the 8LKD
(LD)-L UNIT into the guide holes on top of the
multiline terminal.
10. Slide the 8LKD (LD)-L UNIT toward the keypad
buttons until snug (refer to Figure 5-59 8LKD (LD)-L
UNIT Installed).
Figure 5-58 Ribbon Cable Installed
Figure 5-59 8LKD (LD)-L UNIT
Installed
Projection
(One Each Side)
Guide
Guide

Table of Contents

Other manuals for NEC Univerge SV8100

Related product manuals