9.37
BRAKES
9
9924096 - 2013 RANGER RZR XP 900 / RZR XP 4 900 Service Manual
© Copyright 2012 Polaris Sales Inc.
3. Install the pad adjustment screw and turn until
stationary pad contacts disc, then back off 1/2 turn.
4. Install lower radius rod bolt, washer and new nut.
Torque to specification.
5. Follow brake bleeding procedure outlined earlier in
this chapter.
6. Install wheel and torque wheel nuts to specification.
NOTE: If new pads are installed, refer to “REAR
BRAKE PADS - Brake Burnishing Procedure”.
Radius Rod to Bearing Carrier Bolt:
45 ft-lbs (61 Nm)
Wheel Nuts:
30 ft-lbs (41 Nm) + 90° (1/4 turn)