10. Analyzer shutdown ABL800 FLEX Operator's Manual
Temporary Shutdown
Purpose
This program prepares the analyzer software for switching off power, and is used
for temporary (short-term) shutdown of the analyzer.
This program differs from the Long Term Shutdown used for a long-term storage
of an analyzer that requires removal of system components.
Executing
Temporary
Shutdown
program
To switch the analyzer off for a short time, do the following:
Step Action
1.
Enter the program.
2.
Press Confirm Shutdown to continue.
Press Close to cancel.
3.
Follow the instructions on the screen to complete the temporary
shutdown.
Restarting the
analyzer
To restart the analyzer after Temporary Shutdown, do the following:
Step Action
1.
Verify that the system requirements are met and all components are
installed.
2. Place the power switch in the ON or I position.
The startup procedure begins. When completed, the analyzer’s Ready
screen appears
Depending on the length of the shutdown, the analyzer performs either a cold start
or a warm start.
Continued on next page
10-6