EasyManua.ls Logo

Siemens SITRANS LUT400 - Page 192

Siemens SITRANS LUT400
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SITRANS LUT400
190 Operating Instructions, 07/2019, A5E33329501-AC
Peak 1 End Time (2.7.2.2.4.)
Sets the end time of the high energy cost period 1.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, for example: for 5:30pm, set parameter to 17:30)
Default: 00:00
Used in conjunction with Peak 1 Start Time (2.7.2.2.3.) (Page 189) to define the high cost
period.
For instructions on how to edit parameters with a string editor, see Using the string editor in
Date and Time (2.14.) (Page 226).
Peak 2 Start Time (2.7.2.2.5.)
Sets the start time of the high energy cost period 2.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, for example: for 5:30pm, set parameter to
17:30
)
Default: 00:00
Used in conjunction with Peak 2 End Time (2.7.2.2.6.) (Page 190) to define the high cost
period.
Peak 2 End Time (2.7.2.2.6.)
Sets the end time of the high energy cost period 2.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, for example: for 5:30pm, set parameter to 17:30)
Default: 00:00
Used in conjunction with Peak 2 Start Time (2.7.2.2.5.) (Page 190) to define the high cost
period.
Peak 3 Start Time (2.7.2.2.7.)
Sets the start time of the high energy cost period 3.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, for example: for 5:30pm, set parameter to 17:30)
Default: 00:00
Used in conjunction with Peak 3 End Time (2.7.2.2.8.) (Page 191) to define the high cost
period.

Table of Contents

Other manuals for Siemens SITRANS LUT400

Related product manuals