Chapter 1
8
UM10350_PCNC770_Manual_0916A
Preface
Table of Contents
1. Overview 20
1.1 Specicaons (PCNC 770) 21
2. Site Planning and Prep 22
2.1 General Site Requirements 22
2.1.1 Space Requirements 22
2.2 Electrical Requirements 22
2.2.1 Grounding 22
2.2.2 Plug Paern 22
2.2.3 Ground Fault Interrupter (GFI) Use 23
2.2.4 Electrical Noise 23
2.2.5 Opons for Electrically Non-conforming Sites 23
2.2.5.1 Buck-Boost Transformer 23
2.2.5.2 Step-up/Step-down Transformer 23
2.2.5.3 Quick 220
™
Voltage Converter Power Supply 23
3. Installaon 24
3.1 Receiving, Uncrang, and Inial Inspecon 24
3.1.1 Shipment Arrival 24
3.1.2 Moving the Crate 24
3.1.3 Inial Uncrang 25
3.1.4 Shipping Damage or Shortages 25
3.2 Installaon Sequence 25
3.3 Basic Installaon Procedure 25
3.3.1 Paral Stand Assembly 25
3.3.2 Remove Tool Tray (PCNC 1100 only) 26
3.3.3 Remove Accessory Tool Box 26
3.3.4 Assembling Y-Axis (PCNC 1100 only) 26