EasyManua.ls Logo

Waters Alliance e2695 - Page 205

Waters Alliance e2695
306 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintain the sample management system
July 29, 2013, 715003794 Rev. B 205
5. Unscrew the lower frit retainer by hand.
6. Remove the frit from the retainer by inserting a small-diameter pick (or
paper clip) through the hole in the retainer cap, and discard it.
7. Install the new frit, which has been immersed and wetted; seat it in the
retainer.
8. Reinstall the lower retainer using a clockwise motion, tightening it by
hand until it seats.
9. Reconnect the separations module to the electrical outlet, and power-on
the unit.
10. Reinstall the sample carousels, and close the sample carousel door.
11. Prime the needle-wash pump (see “Prime the needle-wash pump” on
page 109).
Replace the syringe
Tip: For information about isolating problems in the sample management
system, see Chapter 8.
Replace the syringe when these conditions apply:
The plunger tip becomes worn
You want to change to the optional 25-µL or 2500-µL syringe size
Tip: To ensure accurate results, use only syringes approved by Waters for use
in the sample management system. See Appendix C for a listing of
Waters-approved syringes.
Required material
Replacement syringe
To remove the syringe:
1. Set the flow rate to 0.000 mL/min.
2. Open the syringe compartment door.
3. Remove the knurled nut that holds the syringe barrel to the syringe
mounting bracket.

Table of Contents

Related product manuals