Operation0030−1/A1
Winterthur Gas & Diesel Ltd.
4/ 5
P
Pick-up for speed measurement 4628−1/A1.......................................................
Pipe diagram − Water systems 4003−3/A1........................................................
Pipe diagram − Oil systems 4003−4/A1...........................................................
Pipe diagram − Air systems 4003−5/A1...........................................................
Pipe Diagram − Servo Oil 4003−6/A1.............................................................
Pipe Diagram − Oil Systems (Cylinder Lubrication) 4003−7/A1.......................................
Pipe Diagram − Air Systems (Starting Air and Control Air) 4003−8/A1.................................
Pipe Diagram − Air Systems (Exhaust Gas and Scavenge Air) 4003−9/A1.............................
Pipe Diagram − Air Systems (Exhaust Gas and Scavenge Air), Two Turbochargers 4003−10/A1.........
Pipe Diagram − Air Systems (Exhaust Gas and Scavenge Air), SCR, One Turbocharger 4003−10/A2.....
Pipe diagram − Fuel, heating and extinguishing systems 4003−11/A1.................................
Piston 3403−1/A1..............................................................................
Piston cooling and crosshead lubrication 3603−1/A1................................................
Piston and piston rings, running-in of cylinder liner 0410−1/A1.......................................
Piston rod gland 2303−1/A1.....................................................................
Precautionary measures for operation 0210−1/A1..................................................
Preface
0010−1/A1.............................................................................
Prepare the fuel oil system for operation 0120−1/A1................................................
Prepare the servo oil system 0130−1/A1..........................................................
Prepare before taking into service 0110−1/A1......................................................
Prepare before starting after a prolonged shut-down period
or an overhaul 0610−1/A1.......................................................................
Pressure and temperature ranges 0250−1/A1......................................................
Pressure control valve 5562−1/A1................................................................
Pressure release servo oil rail 8016−1/A1.........................................................
Prevention of crankcase explosions 0460−1/A1....................................................
Problems, during operation 0820−1/A1...........................................................
Problems when starting and shutting down 0810−1/A1..............................................
Problems with engine parts (damage) 0840−1/A1..................................................
Procedures after engine stop 0320−1/A1..........................................................
Procedures before putting out of service for a long period 0620−1/A1.................................
Procedures before starting after a short shut-down
(one or more days) 0110−1/A1...................................................................
Procedures to prevent contamination and fire in the
scavenge air spaces 0450−1/A1.................................................................
Propeller curve 0070−1/A1......................................................................
Q
Quality requirements for heavy fuel oil 0710−1/A1..................................................
R
Relationship between engine and propeller 0070−1/A1..............................................
Remote control system defective 0560−1/A1......................................................
Running gear, operation with removed... 0540−1/A1................................................
Running-in of new cylinder liner, piston and piston rings 0410−1/A1..................................
Alphabetical Table of Contents
2016−11