select
tResResponse
timer
reservation granted RES_GRT
t1>tResResponse, then
1-of-n-control in 'cause'
is set
t1
reservation request RES_RQ
command termination
en05000093.vsd
IEC05000093 V1 EN
Figure 333: tResResponse
The timer tExecutionFB supervises the time between the execute command and the
command termination, see figure 334.
execute command
phase A
t1>tExecutionFB, then
long-operation-time in
'cause' is set
open
close
close
open
phase C
close
open
phase B
t1
tExecutionFB
timer
command termination
phase A
command termination
phase B
command termination
phase C
command termination
circuit breaker open
close
* The command termination will be delayed one execution sample.
*
en05000094_ansi.vsd
ANSI05000094 V1 EN
Figure 334: tExecutionFB
The parameter tSynchrocheck is used to define the maximum allowed time between the
execute command and the input SYNC_OK to become true. If SYNC_OK=true at the
time the execute command signal is received, the timer "tSynchrocheck" will not start.
The start signal for the synchronizing is obtained if the synchronism-check conditions
are not fulfilled.
Section 12 1MRK505222-UUS C
Control
666
Technical reference manual