Navigator area
MPR-e and MSS-1c User Manual 3DB19901EFAA Edition 01 255
Figure 4.76 — One shot tributaries provisioning
Figure 4.77 shows the different elements involved in the cross connection, in green the
PDH part and CES part (encapsulation in Ethernet frame done by IWF), in blue the Ethernet
part realized by the switch.
Figure 4.77 — Cross connection functional scheme