Chapter 2: Beginning the Installation
44
Unpacking the Chassis
Figure 10 shows the shipping box for the switch.
Figure 10. AT-SBx908 Gen2 Switch Shipping Box
The items in the box are listed here:
A - Protective bag
B - AT-SBx908 Gen2 Switch
C - Accessory kit
To unpack the switch, perform the following procedure:
1. Lift the switch from the shipping box and place it on a level, secure
table. Refer to Figure 11 on page 45.