EasyManua.ls Logo

Allied Telesis AT-SBx908 Gen2 - Installing AT-SBxPWRSYS2 AC Power Supplies

Allied Telesis AT-SBx908 Gen2
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-SBx908 Gen2 Switch Installation Guide
61
Installing AT-SBxPWRSYS2 AC Power Supplies
This section contains the procedure for installing AT-SBxPWRSYS2 AC
Power Supplies in the chassis. For a list of the components that come with
the power supply, refer to “Unpacking AT-SBxPWRSYS2 AC Power
Supplies” on page 49.
Warning
The power supply is heavy. Use both hands to lift it. You might injure
yourself or damage the equipment if you drop it.
Caution
The device can be damaged by static electricity. Be sure to follow
proper anti-static precautions when installing the device. Allied
Telesis recommends using a properly grounded wrist strap or other
personal anti-static device and an anti-static mat.
To install power supplies in the chassis, perform the following procedure:
1. Choose a slot for the power supply. The power supply slots are labeled
PSU A and PSU B
If you are installing only one power supply, you may install it in either
slot. Allied Telesis recommends PSU A because that slot does not
come with a blank power supply panel.
2. If there is already a power supply in PSU A, lift the handle on the blank
power supply panel in PSU B and slide the panel from the slot. Refer to
Figure 27 on page 62.

Table of Contents

Related product manuals