EasyManua.ls Logo

Allied Telesis AT-SBx908 Gen2 - Figure 26: Installing the Grounding Lug and Wire

Allied Telesis AT-SBx908 Gen2
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3: Installing the Chassis
60
Figure 26. Installing the Grounding Lug and Wire
5. Connect the other end of the grounding wire to the building protective
earth.
6. Go to “Installing AT-SBxPWRSYS2 AC Power Supplies” on page 61 or
“Installing AT-SBxPWRSYS1-80 DC Power Supplies” on page 65.

Table of Contents

Related product manuals