Chapter 2: Beginning the Installation
48
Figure 15. Accessory Kit
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
6. After unpacking the switch, do one of the following:
To unpack the power supplies, go to “Unpacking AT-
SBxPWRSYS2 AC Power Supplies” on page 49 or “Unpacking AT-
SBxPWRSYS1-80 DC Power Supplies” on page 50.
Otherwise, go to Chapter 3, “Installing the Chassis” on page 51.
One 2 m (6.6 ft) local management
cable with RJ-45 (8P8C) and DB-9 (D-
sub 9-pin) connectors.
Two power cord retaining clips