Chapter 4: Powering On the Chassis
80
Verifying the Installation
Please perform the following procedure before powering on the chassis:
1. Verify that the chassis has at least one power supply in slot PSU A or
B.
2. If the chassis has only one power supply, verify that the empty power
supply slot on the front panel is covered with a blank panel. For
instructions, refer to “Installing the Blank Power Supply Slot Cover” on
page 75.
3. Verify that you installed the power cord retaining clips on the AC power
connectors on the rear panel of the chassis. For instructions, refer to
“Installing the Power Cord Retaining Clips” on page 77
4. Verify that the grounding lug on the back panel of the chassis is
properly grounded. For instructions, refer to “Installing the Chassis
Grounding Wire” on page 58.
5. Verify that all empty line card slots on the front panel of the chassis are
covered with slot covers. If there are open slots, perform the procedure
“Installing Blank Line Card Slot Covers” on page 73.
You may now power on the chassis. For instructions, refer to “Powering
On AT-SBxPWRSYS2 Power Supplies” on page 81 or “Powering On AT-
SBxPWRSYS1-80 DC Power Supplies” on page 84: