EasyManua.ls Logo

AT&T 75 - Page 417

AT&T 75
593 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bulk Power Supply
4-22
346 Modular Bulk Power Supply
4-22
EQUIPMENT ROOM DESIGN
4-25
66-Type Hardware Equipment Room Applications
4-25
Trunk/Auxiliary Field
4-25
Distribution Field
4-25
Typical System Equipment Room Floor Plans
4-28
General
4-28
Typical Floor Plans
4-28
Wall Space Requirements
4-32
Equipment Requirements
4-32
Cable Slack Manager Requirements
4-32
66-Type Hardware Requirements
4-32
EQUIPMENT ROOM HARDWARE AND CABLING INSTALLATION
4-33
Hardware Installation
4-33
Installing the Cross-Connect Field
4-33
Installing the Cable Slack Managers
4-36
Labeling the Cross-Connect Field
4-36
Installing the Sneak Fuse Panels
4-41
Cable Installation
4-42
Labeling
4-42
Routing Cable Guidelines
4-43
General
4-43
Routing Cables From Switch Cabinet to Cross-Connect Field
4-47
Installing Control Carrier Outputs Cable
4-49
Installing Trunk Cables Between Network Interface, Sneak Fuse Panel, and
System Cabinet
4-51
Connecting Trunk Pairs to the Switch Cabinet Using Concentrator
Cables
4-55
Connecting Trunk Pairs to the Switch Cabinet Using Jumper Wires To
Establish 3-Pair Modularity
4-56
Installing Coupled Bonding Conductor Grounding
4-58
Installing Cables Between Switch Cabinet and the Cross-Connect
Field
4-58
Installing Cables Between Cross-Connect Field and Auxiliary
Cabinet
4-59
STATION WIRING DESIGN
4-59
Description
4-59
-ii-

Table of Contents