DEFINITY ECS What’s New for Release 10
555-233-004
Issue 1
December 2001
Contents
xix
■ Install the DEFINITY ONE system cabinet 1-56
Verify the carrier address ID on CMC cabinets 1-56
Floor-mount the CMC cabinet 1-57
Wall-mount the CMC cabinets 1-58
■ Check AC power and ground for DEFINITY ONE 1-64
Check AC power 1-64
Approved grounds 1-65
Uninterruptible power supply 1-66
Cabinet power switch 1-67
Connect cabinet grounds and other grounds 1-68
Install coupled bonding conductor 1-71
Connect and route the power cords 1-71
■ Cable the DEFINITY ONE system 1-74
Install Processor Interface cable and TDM/LAN
bus terminators 1-74
Cable two-cabinet DEFINITY ONE system 1-75
■ Install DEFINITY ONE main distribution frame
(MDF) and external modem 1-77
Install the MDF on DEFINITY ONE 1-77
Install the external modem 1-79
■ Install equipment room hardware for DEFINITY ONE 1-80
Cross-connect the cabinet to the MDF 1-80
Allowable circuit packs 1-80
Non-allowable circuit packs 1-83
Circuit pack installation 1-85
Off-premises circuit protection 1-90
Install sneak fuse panels 1-91
Label the main distribution frame 1-94
■ Set ringing option for DEFINITY ONE 1-95
Section III - Install Telephones
and Make Auxiliary Connections 1-97
■ Install and wire telephones and other equipment 1-97
Install Attendant Console — optional 1-109
Install 26B1 Selector Console — optional 1-109
■ Connect external alarms and auxiliary connections 1-110
Telephone pin designations 1-112