5/12
Chapter 5: Routine Operational Procedures
Operators & Maintenance Manual GENIUS Compact Version UK 0.1 © BESTnv
BESTnv Industrial Research BV, Marinus van Meelweg 20, 5657 EN, EINDHOVEN, THE NETHERLANDS
General tel. +31 (40) 292 2622 - Service tel. +31 (40) 292 2620 - Fax. +31 (40) 292 2633 - Email: service.BESTnv@bestnv.com
To start sorting:
1.-
Switch on the sorter as described in the start procedures.
2.- Before starting the product fl ow to the sorter installation, fi rst take new Normalizations for all cameras
and/or lasers (see subchapter 5.3.)
Attention: - Always take into account the warm-up time for the lights and optics, (+/-30
min. after a longer stop), before taking a reference line.
3.- Check that the Compressed air supply and the Water supply (if necessary) are initialised.
4.- When sorting a different product as before, fi rst load an existing product fi le (see subchapter 5.5.)
or create a new product fi le with new product settings (see subchapter 5.6.).
5.- The sorter is now ready to start sorting, simply initialise the product fl ow to the sorter installation.