EasyManuals Logo

EOS P 396 User Manual

EOS P 396
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
Operation of machine & accessories
7.13
Training manual • Basic training • Status 03.14
EOS P 396
7
Preparing building process
Prior to starting a building process, preparatory measures are necessary to obtain an
optimum result.
Necessary activities:
Activating process peripherals:
- Switching on extraction system
- Switching on Cooling system
- Switching laser to ready.
Warm up machine
Loading prepared job, checking if necessary
Defining cooling phase if necessary.
You will find further information on preparing a building process in the Operation
EOS P 396 manual, section 6, Preparing building.
Build
The building of the parts commences with the start of the building process. If
problems occur, the process can be interrupted at any time and, on completion of
the necessary work, continued or cancelled completely.
During an interruption in the building process the current job can be modified by
loading additional parts, changing exposure types or recoating parameters.
Necessary activities:
Start building process
If necessary interrupting, continuing building process
If necessary cancelling building process.
You will find further information on the building process in the Operation EOS P
396 manual, section 6, Building.
You will find further information on dealing with process problems in section 9,
Troubleshooting.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EOS P 396 and is the answer not in the manual?

EOS P 396 Specifications

General IconGeneral
BrandEOS
ModelP 396
Category3D Printers
LanguageEnglish