8
Process monitoring
8.8
Training manual • Basic training • Status 03.14
EOS P 396
4. Open job list:
Click Open job list button.
5. In the Job list field select the job(s) for which the building temperatures are to be
recorded and accept using OK.
6. In the Feedback Form list box select the BT
PPP
option and click the New Entry
button.
7. In the BT
PPP
Values group box, PA2200-Balance row, click the Temperature
column and enter the value determined for the building temperature.
See Checking, determining, setting building temperature.
8. In case of further PPP in the BT
PPP
Values group box separately select the other
rows, in each case click the Temperature column and enter the value for the
building temperature.
9. Accept entries using Apply.
Temperature values are recorded in the EOSTATE database and appear in the Job
Quality Report or in the Machine Report.
Displaying, preparing results, reports, statistics
Using the optional EOSTATE Quality Assurance, Controlling and Machine Park
Management modules events, reports and statistics can be displayed and exported.
The procedure is the same for all modules.
Displaying events
1. Select period that contains the jobs to be analysed.
See Software EOSTATE manual, section 4, Defining period.
2. Select Report view.
3. Open job list:
Click Open job list button.
For the value entered for PPP Balance, the building temperature for further PPP
must be modified as follows:
- TopSpeed: Building temperature Balance + 2 °C
- Speed: Building temperature Balance + 1 °C
- Performance: Building temperature Balance - 1 °C
- TopQuality: Building temperature Balance - 2 °C