EasyManua.ls Logo

ESA VT50 - Transfer PC -> VT

ESA VT50
976 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
405.1200.037.2 - Rel.: 2.21 of 25/02/2008
26-19
• Position the jumper between pins 2 and 3 (line terminated).
• Replace the back cover.
• Reconnect the power supply.
Transfer PC ->
VT
For everything to function properly, the first time the VT operator terminal
is switched on it needs to be correctly loaded, that is it needs to have trans-
ferred to it:
• Firmware
• Communication driver
• Project
(Given that the transfer of the three files in practice occurs with a single
operation, it will be defined as “Project transfer” for the sake of simplicity.)
For this it is essential that the VT be prepared to receive the transfer. (See
also
“Chapter 38 -> Command area“).
Preparation for
reception
The programme VTWIN must be used for the transfer (see Software Man-
ual), but the terminal must be prepared for reception.
This means carrying out the following steps:
• Check that the VT is off
• Check that there is a serial connection between the PC and the VT

Table of Contents

Related product manuals