CHAPTER 21
PAGE 10
PAGE DATE: 7. July 2010
MAINTENANCE MANUAL EXTRA 300LT
Rigging
Refer to figure 3.
1 Loosen Bowden cable attachmant bolt on the distribution
box actuator (10).
2 Place distribution box actuator in the upmost position.
3 Push distribution handle (1) to the full forward position.
Then pull aft 5 mm (refer to detail A of figure 3).
4 Fasten Bowden cable attachmant bolt on the distribution box
actuator (14).
5 Check full travel.