Initial Management Access
Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide
113
To ground the chassis:
1 Locate the grounding point on the back of the chassis (Figure 61).
Figure 61: Back of BlackDiamond 8806/12804 chassis
2 Strip 0.5-inch (1.2-cm) of insulation from the stranded copper wire cable.
3 Insert the stripped wire into the cable lug.
Be sure that no copper is visible between the lug and the cable insulation.
4 Crimp the lug onto the cable according to the manufacturer’s specifications.
5 Insert the screws through the lug and into the grounding point on the back of the chassis.
6 Connect the other end of the wire to a known reliable earth ground point at your site.
Initial Management Access
For instructions on accessing the switch for initial management setup, see Chapter 2, “Initial
Management Access.”
EX_128A
Grounding point
PSU / fan
controllers