EasyManua.ls Logo

Extreme Networks BlackDiamond 8800 Series - Page 143

Extreme Networks BlackDiamond 8800 Series
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Extreme Networks 1200 W DC PSU
Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide
143
Figure 85: Connecting the cable to the front of the 1200 W DC PSU
6 Secure the 1200 W DC PSU into the power supply bay by pushing down on the locking handle until
it clicks in place.
NOTE
The DC PSU does not energize until the locking handle latches.
CAUTION
Use caution when routing the cable harnesses to minimize stress on the cables. It is recommended that the left
most cable harness be routed across the switch and exit out the right side of the grate. The right most cable harness
should be routed across the switch and exit out the left side of the grate. It is important to route each of the outer
most cables out the opposite side of installation to maximize the bend radius and to avoid stress on the cables. The
four middle cables can route in either direction.
7 Energize the DC circuit for the 1200 W DC PSU.
To install additional 1200 W DC PSUs, repeat steps 2 through 6.
NOTE
Leave the ESD strap permanently connected to the switch, so that the strap is always available when you need to
handle ESD-sensitive components.
EX_132
Locking
handle
open
Locking handle closed
traps DC plug
Remove/insert
DC plug
Yellow
lever

Table of Contents

Related product manuals