GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
8 - 208 Section 8-11 - Replacing Options
8-11-18 Replacement of the UECG Assy
This table includes information specific to these instructions. For more information 8-2-6 "Tools needed
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page 8-6.
8-11-18-1 Preparations
1.) Power off/Shutdown the system as described in 1-7-2 "Lockout/tagout procedure" on page 1-25
2.) Remove the Unity Base Tray as described in 8-8-2 "Replacement of the Unity Base Tray" on page
8-130
3.) Remove the Front Cover Assy-T as described in 8-8-3 "Replacement of the Front Cover Assy-T" on
page 8-131
Table 8-113 Manpower, Time, Tools, and PPE
Manpower Time Tools PPE
One person Approximately 15 minutes Phillips screwdriver
Cut resistant gloves
Knee Pad