EasyManua.ls Logo

Hamilton Microlab STAR - Page 102

Hamilton Microlab STAR
284 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Microlab
®
STAR Service Manual
6-18
Pipetting Channel Alignment (continued)
Mechanical Adjustment procedure:
1. Carefully move the Pipetting Arm to a desired position on the deck
2. Uncover Pipetting Arm and remove both Y-Spindles.
3. Place Pipetting Channel Adjustment Tool P/N 173952 as shown onto Pipetting
Arm's upper Y-Guide shafts (approximately in the middle of Pipetting Arm).
4. Gently move Pipetting Channel Z-Guide shaft into Adjustment Tool reference
grooves.
If necessary loosen first Pipetting Channels locking set screws and then slightly
loosen fixing screws to make it fit.
5. Pipetting Channel Z-Guide shaft must slide into reference grooves without
sticking.
6. Check for absolute parallelity between Z-Guide shaft and reference grooves. No
Gap should be visible.
7. Freeze adjustment positioning by tightening all loose fixing screws.
8. Verify Adjustment and check again for absolute parallelity between Z-Guide shaft
and reference grooves.
9. Finally thighten Pipetting Channels locking set screws.

Table of Contents

Other manuals for Hamilton Microlab STAR