EasyManua.ls Logo

Hamilton Microlab STAR - Disassembly; Overview; Checklist for Deinstallation

Hamilton Microlab STAR
284 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Microlab
®
STAR Service Manual
5-1
5 Disassembly
5.1 Overview
The initial deinstallation and packing of the Microlab
®
STAR may only be carried out
by Service Technicians trained and / or authorized by HAMILTON Bonaduz AG. For
proper deinstallation follow the order of instructions given in this section.
Attention: Exercise great care if touching the Channels when packing the
Instrument.
5.2 Checklist for Deinstallation
To ensure a fast and proper deinstallation process follow the checklist. For detailed
descriptions see the subsequent chapters of this manual.
Attention: Do not skip any of the items in the checklist below as this may lead to an
unsuccessful deinstallation.
1. Decontaminate ML STAR Instrument and its components
2. Ensure no Tips or needles are left on Pipetting Channels
Remove any still present
Dispose of Tips
Decontaminate Needles
3. Disconnect ML STAR Instrument
4. Remove all Carriers, Spillage Trays, Loading Trays and the Waste Station from
ML STAR Instrument
Remove from ML STAR Instrument and decontaminate them
5. Remove ML STAR Instruments Panels
6. Pack ML STAR Instrument into Shipping Crate.
7. Carry out Software deinstallation
Attention: Good Laboratory Practices should be observed when disposing of
consumable items such as used plates, disposable tips, steel needles, etc.
Exercise care if touching the Channels when repacking the Instrument.

Table of Contents

Other manuals for Hamilton Microlab STAR