Microlab
®
STAR Service Manual
6-48
6.9.3 Verification after replacement, or remounting
Described below are the necessary actions (such as adjustments, verification and functional check), which have to be undertaken
after replacement, or remounting for each component.
“2” indicates a necessary adjustment, volume verification and/or functional check. Components which are not listed below do not
need any action to be undertaken.
Adjustment
Instrument
Components
Instrument
Check
Auto
adjustment
Autoload
adjustment
Volume
Verification
Functional check
Side Panels of ML
STAR Instrument
- - - -
• Check Collision free movement of Pipetting Arm
Front window
- - - -
2
Cover Switch
- - - -
• check locking function (ML STAR IVD)
• check stop functionality when opened while method
is running
Carrier Stops
- - - -
• Perform loading of carriers
Deck Panels
2
- - -
• Perform loading of carriers
Docking Station
- - - -
• Check Collision free movement of Pipetting Arm
• No collision while carriers are loaded
Waste station
- - - -
2