Microlab
®
STAR Service Manual
8-8
8.1.6 Node settings / Dip Switches
The node settings address multiple components / modules via the CAN Bus system.
CAN Module
switch 6 switch 5 switch 4 switch 3 switch 2 switch 1
Node Abbrev. Name Type Address
0. C0 Master (b) Off Off Off Off Off
1. X0 X- Motor (b) Off Off Off Off
ON
2. I0 Auto Load (b) Off Off Off
ON
Off
3. W1 Wash station 1-3 (b) Off Off Off
ON ON
4. W2 Wash station 4-6 (b) Off Off
ON
Off Off
5. T1 Temperature carrier 1 (b) Off Off
ON
Off
ON
6. T2 Temperature carrier 2 (b) Off Off
ON ON
Off
7. R0 iSwap (b) Off Off
ON ON ON
8. P1 Pipetting channel 1 (a) Off
ON
Off Off Off
9. P2 Pipetting channel 2 (a) Off
ON
Off Off
ON
10. P3 Pipetting channel 3 (a) Off
ON
Off
ON
Off
11. P4 Pipetting channel 4 (a) Off
ON
Off
ON ON
12. P5 Pipetting channel 5 (a) Off
ON ON
Off Off
13. P6 Pipetting channel 6 (a) Off
ON ON
Off
ON
14. P7 Pipetting channel 7 (a) Off
ON ON ON
Off
15. P8 Pipetting channel 8 (a) Off
ON ON ON ON
16. P9 Pipetting channel 9 (a)
ON
Off Off Off Off
17. PA Pipetting channel 10 (a)
ON
Off Off Off
ON
18. PB Pipetting channel 11 (a)
ON
Off Off
ON
Off
19. PC Pipetting channel 12 (a)
ON
Off Off
ON ON
20. PD Pipetting channel 13 (a)
ON
Off
ON
Off Off
21. PE Pipetting channel 14 (a)
ON
Off
ON
Off
ON
22. PF Pipetting channel 15 (a)
ON
Off
ON ON
Off
23. PG Pipetting channel 16 (a)
ON
Off
ON ON ON
(a) The Pipetting channel is defined with Dip switch 6
where OFF = 300ul and ON = 1000ul.
(b) Not currently used.