EasyManua.ls Logo

Hitachi G200 - Checking DBPS Power Supply Unit Connections

Hitachi G200
418 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Pull the lever open while pressing the latch on the power supply inward
with your right thumb. When the lever is completely opened, the power
supply moves forward.
3. Hold the power supply with both hands, and then pull it gently and
remove it.
4. With the lever opened completely, insert the new power supply into the
slot. Wait at least 20 seconds, and then insert the power supply all the
way into the slot.
5. Close the lever completely and secure the power supply. If the lever
cannot be moved, reorient the power supply, and then reinsert it into the
slot.
6. Connect the power cable to the power supply, and then secure the cable
using the cable holder.
7. Confirm that the red ALM LED is off at the power supply and the green
RDY LED is on.
Note: If the ALM LED is on and the status of the power supply is
Normal, go to the Customer Contact Us page at https://
support.hds.com/en_us/contact-us.html.
If the red ALM LED does not go off after more than 30 minutes following
replacement of the power supply, remove the power supply, wait at least
30 seconds, and then reinstall it.
Checking DBPS power supply unit connections
Replacing a power supply 151
Service Guide for VSP Gx00 and VSP Fx00 Models

Table of Contents

Other manuals for Hitachi G200

Related product manuals