7. Series 8 I/O Operations
7.8. Sequence of Events Scenarios
220 Series 8 I/O User's Guide R500
Honeywell April 2017
Figure 61 : Sequence of Events PV Change Delay Scenario
PV State Change event Regeneration
Regeneration is initiated when the:
module goes off the link and comes back again
redundant modules are switched over
redundant controllers are swapped
alarm reporting is enabled from disabled state in Station
When the regeneration is requested:
the IOM regenerates events that are reported in the last 20 seconds from the time
of the ReGen request