Check Item Expected Result Check Result
The humidier oat is secured. The
fasteners for the humidier oat are
secured.
□ Passed □ Failed
Water inlet pipes are connected
securely without leaks.
□ Passed □ Failed
Compressor The sheet metal fastener is removed
from the compressor.
□ Passed □ Failed
The bolts on the compressor are
tightened.
□ Passed □ Failed
The electronic expansion valve coils
are correctly assembled and properly
installed.
□ Passed □ Failed
Cables are securely connected to the
electronic expansion valve coil.
□ Passed □ Failed
The electronic expansion valve coils
do not rub against surrounding
objects.
□ Passed □ Failed
Liquid level
detector
The liquid level detector is securely
installed.
□ Passed □ Failed
The interconnection terminal of the
low liquid level detector has been
connected.
□ Passed □ Failed
The low liquid level detector moves
smoothly.
□ Passed □ Failed
Air lter The air lter is correctly installed
according to the air ow direction on
the frame.
□ Passed □ Failed
Dierential
pressure
switch
The cable ties on the dierential
pressure tubes are secured.
□ Passed □ Failed
There is no foreign matter in the
dierential pressure tubes. The
dierential pressure tubes are not
seriously bent.
□ Passed □ Failed