Figure 132. Hot-swap power supply installation
Step 3. Connect the power supply unit to a properly grounded electrical outlet.
For 240 V DC power supply units:
1. Turn off the server.
2. Connect one end of the power cord to the power connector on the power supply unit.
3. Connect the other end of the power cord to a properly grounded electrical outlet.
For AC power supply units:
1. Connect one end of the power cord to the power connector on the power supply unit.
2. Connect the other end of the power cord to a properly grounded electrical outlet.
Step 4. Make sure the power supply unit handle is perpendicular to the power supply unit; then, tie the
power cord to the handle with the pre-attached strap as shown below.
Figure 133. Routing and tying power cord
After you finish
1. If you have adjusted the CMA to gain access to the power supply bay, readjust the CMA back in place.
2. If the server is turned off, turn on the server. Ensure that:
Both LEDs on the CRPS Premium power supply unit are lit green, indicating that the power supply
unit is operating properly.
The LED on the CRPS power supply unit is lit green, indicating that the power supply unit is operating
properly.