4 Configuring the I/O system in the »PLC Designer«
4.3 Mapping the real station structure in the »PLC Designer«
51
Lenze · I/O system 1000 · Reference Manual · DMS 5.0 EN · 09/2016 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4.3 Mapping the real station structure in the »PLC Designer«
4.3.1 Create a new project in the »PLC Designer«
You can create a new project in the »PLC Designer« without having to establish an online
connection. After having configured the project, go online with the I/O system 1000 to transfer
parameters.
How to create a new project in the »PLC Designer«:
1. Select the menu command FileNew project to create a new »PLC Designer« project.
2. Select the "standard project" template in the New project dialog window.
• Enter a name for the »PLC Designer« in the Name input field.
• Select the desired memory location under Location.
3. Confirm the entries by clicking OK.