Crane operation
11.1 Before operating the crane
11 - 2 3 112 993 en Operating manual GMK 6400
12.07.2013
3. – Switch on the cameras for the operation of the crane; à p. 12 - 136.
– Adjust the slewable spotlights if necessary;
à p. 11 - 109.
4. Earth the load, if necessary;
à p. 11 - 12.
5. Adjust crane cab seat and front panel;
à Adjusting the crane cab seat and front control panel, p. 11 - 7.
6. Start the engine for crane operation;
à p. 10 - 8.
7. Check
– RCL,
– Lifting limit switch,
– Seat contact switch and dead man's switch,
– Emergency stop switch,
for correct operation. Have faulty units repaired;
à p. 11 - 9.
8. Check the position of the hoist ropes;
à p. 11 - 6.