Crane operation
11.1 Before operating the crane
Operating manual GMK 6400 3 112 993 en 11 - 3
12.07.2013
9. Remove key from the key-operated Override switches; Ã p. 11 - 40.
10. Compare current rigging mode to display on RCL – enter current rig-
ging mode, if necessary;
à p. 11 - 23.
11. Compare current reeving of hoist used against the display on the RCL –
enter current reeving, if necessary;
à p. 11 - 29.
12. Check telescoping;
à Checks before starting work, p. 11 - 75.
13. Perform lamp test on the RCL;
à p. 11 - 20.
s