Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual GMK 6400 3 112 993 en 12 - 3
12.07.2013
10. Earth the truck crane, if necessary; à Earthing the truck crane, p. 12 - 13
11. Fold out all ladders;
à Ladders, p. 4 - 5.
12. Inspect the truck crane, while looking out in particular for any leaking
fluids (oil, fuel or water)
13. Start the engine for crane operation;
à p. 10 - 8
14. If necessary, switch off the houselock and unlock the superstructure;
à Switching off the houselock, p. 11 - 17
à Unlocking the superstructure, p. 11 - 14
15. Pick up the hook block and reeve the hoist rope again, if necessary;
à Hook block on a separate vehicle, p. 12 - 111,
à Hook block on the bumper, p. 12 - 109,
à Reeving and unreeving the hoist rope, p. 12 - 114.